SSO News - BRECKENRIDGE for STORMBREW Collection

Open PDF
Creating agency: NSA National Security Agency (US)
Document date: 2009-10-07
Pages: 1
Genre: report
Classification: TOP SECRET SI
Dissemination: -

A 2009 NSA internal report announcing the completion and security certification of BRECKENRIDGE, STORMBREW's newest cable-head collection site, describing a 10,000 square foot facility designed to host 15 TURMOIL processing systems providing 150 gigabits of processing capacity against newly acquired cable access — the first cable-head collection effort conducted under the STORMBREW program.

Long Description:
This top secret internal NSA report, dated October 28, 2009, documents the completion of SCIF construction and security certification of the BRECKENRIDGE facility on September 11, 2009. The 10,000 square foot site represents a significant infrastructure investment, equipped with power, communications infrastructure, and equipment racks designed to support the planned near-term deployment of 15 TURMOIL processing systems providing 150 gigabits of processing capacity against a newly acquired and redacted cable access. A signal survey conducted by SSO indicated a potentially rich target environment of both DNI and DNR traffic, with initial collection system deployments scheduled for the second quarter of 2010. The BRECKENRIDGE effort had been in development since February 2007 — spanning nearly three years from initiation to certification — and is identified as the first cable-head collection effort ever conducted under the STORMBREW program, marking a significant expansion of STORMBREW's collection architecture beyond its previous switch and router access model.
Programs:
BRECKENRIDGE, STORMBREW, TURMOIL, SSO

People mentioned:
-

Countries:
-

Tags:
SSO, SCIF, cable tapping, fiber optic cables, collection sites, infrastructure, signal survey, processing capacity, collection architecture, surveillance architecture, facility construction

Identifier:
sso-news-breckenridge-for-stormbrew-collection

PDF SHA-256:
a8eed402461124cdfce9b125655d960783e5bc639f4d89e369e0764c4698060b

(TS//SI) BRECKENRIDGE for STORMBREW Collection
By [REDACTED] on 2009-10-28 1035

7 October 2009

(TS//SI//NF) STORMBREW has completed SCIF construction and also received security certification for BRECKENRIDGE, its latest collection site on 11 September 2009. The 10,000 square foot facility is equipped with the necessary power, communications and equipment racks to support the planned near-term deployment of 15 TURMOIL systems, providing 150G of processing against the newly acquired [REDACTED] The results of a recent signal survey, conducted by SSO, indicates a potentially rich target environment of both DNI and DNR. Initial collection system deployments are scheduled for 2nd quarter 2010. The BRECKENRIDGE/[REDACTED] effort commenced in February 2007 and is the first "cable-head" collection effort conducted under STORMBREW.

(U//FOUO) POC: [REDACTED], Deputy PD STORMBREW, [REDACTED].