NSRP Build 2.8 To Be Released Tomorrow

Open PDF
Creating agency: NSA National Security Agency (US)
Document date: 2006-01-23
Type: SIDtoday
Pages: 2
Genre: newsletter
Banner:
Classification: UNCLASSIFIED
Dissemination: FOUO

A new tool used for information needs — customer requirements for signals intelligence collection — is about to be published.

Long Description:
This SIDtoday article announces the release of Build 2.8 of the National SIGINT Requirements Process (NSRP), scheduled for January 24, 2006. The upgrade introduces a completely new Research Information Need (IN) tool and associated processes, including assignment of Research INs to multiple Product Lines, automatic response plan generation, and tracking via the National Producer Interface (NPI) Tool. Additional changes include EEI-level capability detailing for external customers, analyst-friendly features, and mandatory training for NPI Client Users, with extended enterprise training to be conducted via video teleconferencing.
Programs:
NSRP, NPI, RRT

People mentioned:
-

Countries:
-

Tags:
information needs, requirements, NSRP, npi, training

Identifier:
2006-01-23_SIDToday_-_NSRP_Build_28_To_Be_Released_Tomorrow

PDF SHA-256:
17157854e96485aa831d481ab3c082d47b08ef56396e2e0bfcd3cde1491c7c6f

DYNAMIC PAGE -- HIGHEST POSSIBLE CLASSIFICATION IS
TOP SECRET // SI / TK // REL TO USA AUS CAN GBR NZL

SIDtoday

(U//FOUO) NSRP Build 2.8 To Be Released Tomorrow

FROM: [REDACTED] and [REDACTED]
Information Needs and Outcomes (S1111)
Run Date: 01/23/2006

(U//FOUO) Upgrade designed to improve the Information Needs process...

(U//FOUO) On January 24, 2006, The National SIGINT Requirements Process (NSRP) Build 2.8
will be released. What's different and new, you ask? Many of the changes that you have been
asking for!

(U//FOUO) A completely new Research IN tool and its associated processes have been
incorporated into the NSRP. This new tool will encompass the entire Research IN* process.
Specific changes include assignment of Research INs to multiple Product Lines at once,
generation of a response plan upon acceptance of the need, and tracking/publication of the
responses via the National Producer Interface (NPI) Tool. Research INs will have their own status
board in the NPI Tool, separating them from the standing and limited duration INs.

(U//FOUO) Additionally, Research INs will automatically close thirty days after the final response
is published. This change will eliminate the integration and dependence on the Research IN
Responder Tool (RRT) that is currently in use. (Fewer tools!) All legacy research response data
will still be available via the NSRP web site and any non-closed Research INs will automatically
be converted to the new structure once version 2.8 is released.

(U//FOUO) Other changes include...

Shaping Client Expectations:

  • (U//FOUO) Build 2.8 provides the long-anticipated ability to detail NSA/CSS capabilities at the EEI Level which external customers find critical to making operations decisions.
  • (U//FOUO) A 16th standardized statement has been added, allowing for improved binning of paragraph responses.

Analyst-Friendly Features:

  • (U//FOUO) Table of Contents with additional links to related INs.
  • (U//FOUO) IN Title relocated to the top of the page.
  • (U//FOUO) Improved details on before and after priorities for all Global Updates - used most commonly for the integration of the National Intelligence Priority Framework matrix.

(U//FOUO) These are just some of the new features for NSRP 2.8. Please visit the NSRP website
for a complete list of changes. Due to the extensive improvements in Build 2.8, training will be
mandatory for all NPI Client Users. Please go to the events webpage to register for training.

(U) Extended Enterprise Training:

(U//FOUO) NSRP Build 2.8 Training for the extended enterprise will be conducted via VTC*.
S1111 is scheduling a pilot project with NSA/CSS TX for February. If the training goes well and is
understandable via VTC, then S1111 will be coordinating with the S11 extended enterprise
points of contact (POCs) to schedule their training. If the VTC is not the appropriate way to
conduct this training, S1111 will then contact the appropriate POCs to work out what type of
training is the most effective.

*(U) Note:
IN = Information Need
VTC = Video Teleconferencing

"(U//FOUO) SIDtoday articles may not be republished or reposted outside NSANet
without the consent of S0121 (DL sid_comms)."

DYNAMIC PAGE -- HIGHEST POSSIBLE CLASSIFICATION IS
TOP SECRET // SI / TK // REL TO USA AUS CAN GBR NZL
DERIVED FROM: NSA/CSSM 1-52, DATED 08 JAN 2007 DECLASSIFY ON: 20320108