SIGINT IPT Creates Site Prioritization Report

Open PDF
Creating agency: NSA National Security Agency (US)
Document date: 2004-03-15
Type: SIDtoday
Pages: 2
Genre: newsletter
Banner:
Classification: SECRET SI
Dissemination: -

A SIGINT product team produced a classified report prioritizing sites for deployments of future systems.

Long Description:
This SIDtoday article announces that on March 8, 2004, MG Quirk signed a Site Prioritization Report developed by the SIGINT Integrated Product Team (IPT) and approved by the SID Executive Leadership Board. The over-350-page report prioritizes sites for the deployment of future SIGINT system capabilities, grouping sites into five access-type categories aligned with the SID budget structure: HF/Tactical, Overhead, FORNSAT, SCS, and Cable/End Point. It resulted from a two-phase effort begun in July 2003 that combined mission priorities from the National Intelligence Priorities Framework with strategic plans, reporting statistics, and deployment data, and it is intended to be updated periodically.
Programs:
TRAILBLAZER, ITIS

People mentioned:
Quirk, Richard, Barton, Kevan L., Cawley, Frank, Mossberg, Liz, Roser, Jim

Countries:
-

Tags:
site prioritization, deployment, transformation, integrated product team, budget

Identifier:
2004-03-15_SIDToday_-_SIGINT_IPT_Creates_Site_Prioritization_Report

PDF SHA-256:
7415d36b334bf51195c3771fd04332b98bbc7c86fd17281a987909c5f770bc68

DYNAMIC PAGE -- HIGHEST POSSIBLE CLASSIFICATION IS
TOP SECRET // SI / TK // REL TO USA AUS CAN GBR NZL

SIDtoday

(U//FOUO) SIGINT IPT Creates Site Prioritization Report

FROM: [REDACTED]
Chief, SIGINT Requirements Architecture (S01R3)
Run Date: 03/15/2004

FROM: [REDACTED]
Chief, SIGINT Requirements Architecture (S01R3)

(U//FOUO) On March 8th, MG Quirk signed a report that prioritizes sites for deployments of future SIGINT system capabilitities. This Site Prioritization Report, put together by the SIGINT Integrated Product Team and coordinated and approved by the SID Executive Leadership Board (ELB) and external field elements, contains information that will be used as guidance for the deployment of transformational capabilities. The report is a dynamic document that will be updated on a periodic basis.

(U//FOUO) The report cannot be posted on NSAnet due to classification issues, but if you would like a copy, contact [REDACTED] at [REDACTED] nsa. He will email you a copy PKI-encrypted.

(U//FOUO) The Site Prioritization Report is a detailed, comprehensive report containing over 350 pages (those interested in the bottom line should refer to Section 3, Prioritization Results, pages 30-38). The report describes the processes the IPT used to develop the site lists along with "as is" and "to be" prioritized lists of sites. The report appendices provide additional information on the contributions of the sites along with integrated site lists based on the topics of terrorism and Trailblazer.

(S//SI) The report prioritizes sites within their respective access types, which were grouped into five broad categories that align with the SID budget structure:

  • HF/Tactical
  • Overhead
  • FORNSAT
  • SCS
  • Cable/End Point

(U) Background

(U//FOUO) In July 2003 the SID ELB initiated a two-phase effort to conduct studies to provide SID leadership with information to make decisions related to transformation. The Phase I team produced a list of mission priorities based on the National Intelligence Priorities Framework (NIPF). The Phase II integrated product team (IPT) used the mission priorities output from Phase I and combined it with other available input (e.g. strategic plans, reporting statistics, deployment plans, etc.) to create a comprehensive report recommending the proposed prioritization of sites for deployment of future SIGINT system capabilities.

(U//FOUO) The Phase II effort began in August, and in just 60 days, the IPT researched, evaluated and synthesized information from numerous sources to create their recommendations. The IPT used information such as mission priorities, strategic plans, reporting statistics, and deployment plans, as well as site tasking and capabilities, site manning and skill mix, and dependencies between the sites. The team combined this disparate information into an extensive set of data, which they meticulously analyzed to form their final recommendations for the prioritized lists of sites.

(U//FOUO) At the completion of the study the IPT co-leads briefed the results to the SID ELB. The results were very favorably received and the team was directed to document the results in a report. Further, the ELB agreed with the IPT's recommendation to update the site prioritization on a regular basis and the Chief of S2 volunteered his organization to perform this task in the future.
(U//FOUO) The Site Prioritization IPT was co-led by [REDACTED] from S01A and [REDACTED] from S01R and had the following members:

  • [REDACTED] (Trailblazer)
  • Kevan Barton (S01R)
  • Frank Cawley (CNSG)
  • [REDACTED] (AFCO)
  • [REDACTED] (CNSG)
  • [REDACTED] (Trailblazer)
  • [REDACTED] (CSRC)
  • [REDACTED] (S01X)
  • [REDACTED] (S01X)
  • Liz Mossberg (SigDev)
  • [REDACTED] (LASEO)
  • Jim Roser (S3331)
  • [REDACTED] (LASEO)
  • [REDACTED] (S2094)
  • [REDACTED] (ITIS)
  • [REDACTED] (S17)

"(U//FOUO) SIDtoday articles may not be republished or reposted outside NSANet without the consent of S0121 (DL sid_comms)."

DYNAMIC PAGE -- HIGHEST POSSIBLE CLASSIFICATION IS
TOP SECRET // SI / TK // REL TO USA AUS CAN GBR NZL
DERIVED FROM: NSA/CSSM 1-52, DATED 08 JAN 2007 DECLASSIFY ON: 20320108